MizCo | Design of Cyclone Rated Frame for Air Conditioning Units on NRA. | Design of cyclone rated frame for air conditioning units on NRA. Fabrication detail drawings were required. |
G2G Solutions Pty Ltd | Checks to a modified platform | Design checks on an adequacy of a platform that has been installed incorrectly |
CHINT Electric Co. | Design of Type 32 Transformer Lifting Lugs | Design of lifting lugs for type 32 transformer |
CHINT Electric Co. | Design of Lifting Lugs for 4MVA Transformer | Design of lifting lugs for 4MVA transformer |
Kempe Linkweld Engineering | Sampson Post Frame | Design of mobile double Sampson Post Frames |
Forge Group | Design Checks for 59 Wet Well Davit Slabs | Design of new concrete slabs to support flush mount davits on 59 wet wells for Water Corp |
Forge Group | Clinker Shed Column Truss Replacement | Clinker shed column truss replacement |
Kounis Metal Industries | Engineering Design – Lifting Calculations of Switchboard | Lifting calculations for two switch boards |
CHINT Electric Co. | 2x Lifting Lug Design Modifications | Modifications to 2 off transformer lifting lugs. Modify calculations and revise report |
Parsons Group | Hensbrook Loop Forrestdale | Review, site visit, construction signoff of structural details for tilt up panel and steel truss building |
Orontide | Design Checks on Footings | Design checks on footings |
Power Infrastructure Services | Certification of 3 Kiosks | Certification of 3 Kiosks. 2 are steel and 1 is stainless steel |
Kounis Metals | Design of Enclosure Footing | Design of enclosure footing to wind region |
Chromalox, France | Design Verification for the Electric Heater | Design verification for the electric heater |